Sequoia Construction photos

The Toilet Room/Gaucho Partition and Front Wardrobe Wall will give ridgidity to the structure, as will subsequent cabinetry. The front walls are installed after all the other partitions are in place.


Blocking should be provided for stop and tail lights as shown. Wires are run prior to installing exterior covering.


In bending the rear and front aluminum panels over the sides, use hand pressure on the panel being bent to form a "crimp", and force around the corner with a mallet for a tight fit.

Continue