Subject: Canyak
Date: Mon, 13 Sep 1999
From: elk1
This is the canyak I built with GLEN-L plans
The boat was done in 4 weeks. I changed the cockpit. We run the boat down the
Boise River. Boat was flawless; hit some whitewater. Thanks GLEN-L
Some pictures.
Randy
PS
Ready for the next boat


Return
|