Cracker Box by Bob Londress / Decatur, AL

4-24-05

Cracker Box hull righted

Transom view

I have completed the bottom and have turned it over, I now consider this a hull, not a boat, just a hull. I am getting ready to frame the hatch openings and run the wiring and plumbing along with sanding and coating the inside before decking it. Will keep you posted. Bob

Cracker Box looking aft



11-17-07

Hull complete, wiring complete, decking is half done, I wanted to get all the wiring complete before finishing the after deck panels.
Driveline and engine rail mounts roughed in and all engine machine work is done, needs to be assembled.
Shooting for an April or May completion, its time to get it done

Continue