Tubby Tug by Kevin Brown12 January 2008 The first board was cut on September 9, 2007 and the "sea trial" and consequent touch up paint (I scuffed it up at the dock) happened today, January 12, 2008. It took just under 100 hours of actual build time over the four month period. I finished just in time to give it to my daughter on her 4th birthday tomorrow! This is the second boat I have built but the first Glen-L design. I will be building boats in the future but I will NEVER build another boat unless it is a Glen-L Design. The full-size patterns and layouts saved me much more than the cost of the plans. The time the plans and patterns save are immeasurable. Thanks again for a wonderful design. I think I might build a Squirt next! Kevin Brown p.s. I chronicled my construction at www.tubbytug.com
|