Glen-L 14 by Mark Park
October 28, 2008
I've almost completed the boat (just fighting some small
leaks around the centerboard pin) and just have not been able to
get some pics of sailing it yet (I've had it out sailing
about 6-7 times now). As it get's colder her in North
Carolina, I'm running out of chances to get on the lake and
get some images.
(June 2008) Erica and I are installing the Decking.
(June 2008) The decking has been installed and we've
started adding trim and rubrail. Soon we'll be ready to
sand and clear coat it all.
(July 2008) Deck all sanded and fiberglassing it. A rare
photo of my wife working on the boat in the back (she's
usually the one taking the pictures).
>
(September 2008) Standing Rigging complete and running
rigging started.
We took her out to see if we could sink her. A
"positive floatation test". Well, this is as far as
it will go under, it's not going to sink.
It was a snap to right, even my 50 pound daughter could do
it. We repeated the test with full sails and got the same
results, except she (my daughter) could not right the boat.
It was still fairly easy for me to right, though.
This was a GREAT SUCCESS!
Please visit my construction web page "Building the GL-14 Sloop"
Return
|