TNT by Lee DenBraber, Peoria, Illinois

9 July 2011 Update


Painting the bottom.


Waiting for the paint to dry before the flip.


The flipping party!


Two proud boat builders.


Anxious to remove the building form.


After the flip.


April, 2011. Checking to see how the Teleflex SS151 NFB rack system will mount.


Working on the interior.


May, 2011. Creating a rabbit joint on the dash for the decking. My Dremel tool came in handy again.


Finished rabbit joint on the dash.


June, 2011. Encapsulating some of the interior using cardboard to catch any drips.


Encapsulated interior. It is dusty but that can be cleaned up later.


Dry fitted decking. Still needs to be trimmed. Now she is really starting to look like a finished boat.



Return