Port and Starboard side planking faired to Chine. Scallops in battens
completed. Bottom planking butt blocks installed. 1st aft bottom panel
installed. Next step is 2nd aft bottom plank, and then the two front bottom
planks, which will be harder.
I am including a few more .jpg pictures showing work in progress. The best
ones are of my son and I installing the 1st bottom plank. We had to work fast
as it was a race to finish before the plastic resin glue set up. The scallops
in the battens were done by hand using a wood rasp. This took about an hour,
and the scallops are about 1/2" deep.
I used mahogany to back up the butt joints on both the side and bottom
planks.