The Rob Roy as built by
Larry "Rehd" Brown, Fresno, Calif

5. Panels glued, and laid out to show alignment and color match of panels.

6.Beginning to scrape off high spots and preparing for sanding. Most of the wire holes are plugged and needing to be redrilled.

7. This is the glass I put over the joint of the bottoms. There are two layers there, and even though it looks like the threads go with the seam, they are actually biased on both pieces. This was taken on 10/28.

8. This shows the sides glassed at the joints, sanded and ready to get glassed. Also, there are around 100 wires cut and some 30 to 40 more would be needed later. 11/5 or 6

Continue