|
Winter/Fall 2005: Placed skeg on the bottom of the hull.
Painted the bottom with Interlux VC Performance Epoxy. Lots of sanding... Turned Hull over and placed it on a trailer.
7/5/2005: Completed framing for the floorboards. I diverged from the plans at this point.
Installed floorboards, but holding off on painting them until the deck is faired and I am not stomping around or dropping heavy tools on them. I have begun installing the deck framing and hope to have that and the motorwell complete in a few weeks. |