Encapsulated entire inside with one coat of poxy shield. Started to add guard rail but realized it was premature if I was going to put on a cabin. Plan to go with version B of cabin plans. Splash well is constructed, forward deck framing is complete and starting to add partial deck beams.

Partial deck beams and carlings now in place. I glued up sections decreasing length of white oak so as to not use a single wide board for carling.

Had strong hopes for this to be a 2 year project but it will go into another season with hopes to finish in 2 more months of working time.

Now that she's right side up I have to cover it more carefully. A 4" strip ripped off a 3/8" sheet of plywood will fit securely between the sheers with a near perfect crown to drape a tarp over. I'll probably put one at every other frame.