Building the Tunnel King - Part 2

by Matthew Green

Continued

error-file:TidyOut.log

Another view of the frames on the building jig (looking toward bow).
The 2x6's that the frames are set up on are not part of the boat, they simply provide a stable surface for construction. The temporary battens connecting the frames were ripped from the Frame Kit crate. Note lightener holes have been cut out and radiused.

error-file:TidyOut.log

The assembled frames (looking aft).
This time with the bow frame. Note that the bow frame is not installed until later, when the boat is flipped right-side up for the first time.

Return

WebLetter 16, Part 3