The "Russell G" - 2

Boat shed raised for top side work. The overhead framing was also used to roll the hull.


In the slings prior to turning.


Turning crew watching close.


Another #1 helper, checking things out after coating inside with resin.


Start of cabin work.


Leaving shed so engine can be lifted on the shed inside overhead.

Continue