Bo-Jest19 April 2007
Here is the railing being installed on top of the bulwark. The curved section is made from six 1/8" layers glued together.
Trimming the railing to the correct width.
Here is a picture of the motorwell. I installed aluminum plates so the motor does not hang directly on the fiberglass. The tube on the left hand side is for the steering cable/rod.
The window holes and frames are made before being installed on the boat.
The back wall is installed.
Framing up the helm. |