Bo-Jest6 September 2006
The bottom is painted with marine enamel paint. The framing is installed for the deck. I increased the area of the cabin by about two inches by decreasing the width of the walk around deck.
Fitting the plywood for the deck.
My little helper
Facing aft, the two sections for the port and starboard fuel tanks are completed. Later there will be cushions on top for seating. The motorwell will hang a Yamaha 9.9 high thrust outboard. Below the well will be the battery compartment.
This is looking inside the fuel tank compartment. There will be two 6-gallon tanks.
I installed a fuel selector switch. |