Feedback: Pot Luck

by Brian West

My friends showed up on a Saturday afternoon to help turn it over. I spent about 2 hours setting the poles the night before.

The operation of turning it over took about one hour, and it took about two to block her up. The total cost of the timbers, frame, chain hoists and ropes to turn her was $875.



A long way from there to here . . .

Return