Sides are installed, forward bottom temporarily installed. Note that towels and boiling water were again used to facilitate bending. The panel will be marked along the stem, removed, cut, then installed permanently. |
|
All planking has been applied, holes and gaps filled, and a coat of Poxy-Shield epoxy resin has been applied. |
|
The hull has been fiberglassed. The overhanging cloth will be trimmed off and the hull sanded, ready for undercoat. |
|
The undercoat was applied and sanded, followed by the final color coat. Note that the bow eye has been installed. |