![]()  | 
This is the same procedure being done on the mast for the Eight Ball-SG. Here Allyn is putting the polyethylene film layer on. | 
![]()  | 
Resin is applied as loth is wrapped around the form. Cloth becomes transparent as it is wet out. | 
![]()  | 
Here the mast tube has been filleted in place and reinforced with fiberglass tape. | 
![]()  | 
Both mast tube and daggerboard trunk are filleted in place in this Eight Ball-SG. |