![]() |
This is the actual bottom planking and transom with temporary stem and frames. Cardboard side planking is held in place with duct tape |
![]() |
Stitching up... side to bottom planking. |
![]() |
Coker Mays, able boatbuilder, placed a total of 9 layers of fiberglass on
stem, bottom, side joint. "Strong as a Greek ram." Biaxial on stem, standard 9 oz. 4" tape on chines. |