Building the Sea Knight 5Continued...13. A view of the hull, ready for topside construction. 14. The motorwell is in the process of being built. The motor cutout was made for a short shaft motor. A long shaft can be used, but the cutout would have to be modified. 15. The framing for the foredeck is in place. |