Tiny Titan Construction

Fig. 9: The decking panel is held or clamped in place for rough marking. By carefully fitting the 4' x 8' panel will cover the entire deck area.



Fig. 10: Fitting of the decking need not be closely done as it can be trimmed after fastening in place. The area along the carling that will mate to the coaming should be carefully trimmed to provide a vertical surface for attaching the coaming.



Fig. 11: The coaming is fitted against the carling, notching around the bow piece at the forward portion and around the transom aft.



Fig. 12: The dash beam and forward deck beams are fastened against blocking on the inside of the coaming.

Continue