Jimbo by Larry Wilson
3 January 2007 As of January 1, 2007 I have progressed thus far: I have stitched together the hull. I have epoxied the interior joints. I have installed the interior sheers utlilizing mahogany. I am now in the process of fiberglassing the interior seams.
![]() Installing the inner shears
26 September 2007 We sold one of our cars so this freed up garage space for me to transfer to boat to the garage and finish it there. Here is a picture of the wheeled platform I built to mount the boat on during construction. I am now making cradles to set on the platform to support the boat while working on the inside. The platform is 4 feet wide and 12 feet long so there will be a little overhang.
|