October 26,03
Thanks to a Humidity & Temperature Gauge, without it, the painting work would be by guessing only. Doing the painting work during the early Monsoon Shower is full of suspense & fun. Sometimes we have to act as a local weather forecaster. Can not entirely depend on TV & Radio Forecasting, not accurate enough. Choosing EPIFANES System is a right decision, their standing time after mixing (polyurethane) is longer (8 hours) before reaching cure time or hardened.

Epifanes Two-Component paint system on Fiberglass below waterline with Osmosis Prevention consists of: 1 coat of Epifanes Interimcoat, 5 coats of Epifanes Epoxy Coating HS, 1 coats of Interimcoat and 3 coats of Epifanes Foul-Away.

Two Component paint system on Fiberglass above the Waterline. 1 coat of Epifanes Epoxy Primer and 3 coats of Epifanes Polyurethane.

November 03, 03
At 0700 hours made a final inspection from the Check List. Dismantling work shelter ...done. Dismantling roof in between 2 cabins ...done. Crane and operator at site ...done. General briefing to the crane's operator of method of lifting and Safety briefing ...done. Alright! Let's do it!

Continue