Rebel
      Construction Pictorial 8

Fig 36: The hull is righted and chocked level to prevent distortion while the deck and interior is completed.


Fig 37: The intermediate deck beam is arced to the same crown as the Frame 5 deck beam. Note the blocking for this member at the sheer.


Fig 38: The carlings are sprung into position and glued and fastened at the transom, each of the frames and the Frame 5 beam.


Fig 39: Trimming the planking and beveling the sheer for the decking must be done carefully to provide a fair surface to attach decking to.


Fig 40: The athwartship 2" x 4" (nominal) member is beveled to mate to the transom, glued and fastened in place.


Continue