Glen-L 13 Construction Pictorial
Fig 35: The overhang of the planking along the sheer must be faired off. Fairing is done all along the sheer to conform to the angle of the decking as it hits this member.
Fig 36: Blocking is provided at Frame #3 and the transom, then the carling is sprung around the inside of the frame members. Be sure to leave the carling slightly high so that it can be faired for the side decking.
Fig 37: Blocking is provided and the forward deck beam screwed into position at the dimensions noted in the plans.
|