Boat Project Registry How to submit registry information
KINGFISHER / Anthony Karnavas / / 3-3-98: Purchased plans. / 7-1-99: Began cutting plywood patterns for all frame members. These were used to mark the 1" white oak and rough cut all parts. Each part was mated to the appropriate pattern and run on a shaper with a straight cutter and collar of the same size. / 7-15-99: Assembled frames using resorcinol glue, bronze nails and screws. 4-9-03: Projet on hold until cabin done. I think it will be a great boat if I don't get anymore projects. KINGFISHER / Richard Steller / / 6-18-00: Applying plywood planking. 4-9-03: The project is still underway. The entire fiberglassing process is done and the boat is flipped over. My Dad is the one building the boat and has moved it down to Florida where he is finishing the inside. Ronda Steller (The boat builder's daughter). KINGFISHER / Alan & Scott Bailey (father/son) / email address not valid 4-8-03 / 8-7-00: Began construction Dec 1999 with cutting white oak frames from plans. Hull has been planked with marine plywood, glassed with epoxy and painted two-tone white bottom and black sides with imron 5000. Turned hull over 3 weeks ago and have began to install decking and floor. Also have contracted a local trailer builder to provide a trailer (hopefully soon). We have deviated from the center console design and are building a small cabin and full windshield to provide protection from the central coast winds where we plan to fish. Jan 9,2001: The trailer has been completed and the hull is now sitting on the trailer. The trailer is a single axel design and is fitted with bronze disk surge brakes. It turned out well and was worth the wait. The boat now has the cabin installed and painted. The windshield is still rough. We anticipate the safety glass will be ready to be installed thus completing the windshield installation in a week. With this done, the outside will be complete. We are now starting to work up the inside starting with the dashboard and the seating arrangement. We are also in the process of trying to locate a late model 150 HP outboard. We anticipate the launch date to be sometime in May, 2001. (See Customer Photos)
KINGFISHER / Bruce / WI /
/ 8-4-00: Started building my Kingfisher better than 2 years
ago and am about 80% done. I AM FISHING IN IT THOUGH!!! I
constructed mine with okoume plywood over mahogany frames.
Lengthened it to 20'4" and hung a 200 efi merc on
the 25" transom. She'll do 60 mph using the speedo
pickup provided with the engine and 72 mph if you believe the
paddle wheel on the raytheon depth finder. One disappointment
for me is the ride. The book says she has a bulbous keel for
a soft entry. Well, this bulbous keel when you add a lift
strake to each side of it adds up to a flat spot from frame 3
to the transom that is about 15 inches wide. It makes her
fast but she pounds a bit. I still like it!! Always eager to
answer questions. Feel free to e-mail me. If you get boat
builder magazine then you've seen my boat in various
stages of construction already. Router scarfing plywood
panels and fitting lift strakes. 4-10-03: Been done for 3
years now. She runs at 53mph with a 200 merc EFI. I
lengthened the hull to 20'4" and it has a 15hp
kicker on it. Lots of great comments from onlookers. KINGFISHER / Gösta Ström / Sweden / / 10-15-00: I started building in May 2000, frames are now in place.I have started the bottom planking, I think the boat will be ready for sea by May next year. KINGFISHER / Tom Joiner / Salt Lake City, UT / / 10-19-01: Have completely built the boat (in my mind) after hours of study and planning. Have read Glen-L's book, twice! Found it to be invaluable. Boat will be 20' long. Currently cutting out and assembling frames. 1-8-02: Frames completed. Assembly to start in two weeks. KINGFISHER / James Johnson / Suva, Fiji / / 11-5-01: Started kingfisher 10/2000 and have taken two weeks off work. have set the planking and am ready to fiberglass. I live in Fiji and will be using the boat around the reef both inside and out. 7-1-02: My two sons and I began this project last year and registered our project in October. We extended it to 19' which just fit inside the work area. We launched the boat two weeks ago and it performed great. I was impressed by how dry the cockpit stayed. I have equipped the boat with a dual system for safety. I have two independent fuel, electrical and power systems in case one has a problem the other will see us through. Many stories and disasters are told about traveling and fishing in Fiji waters. The waters here justify the added expense of a duel system. I also put Styrofoam under the cockpit floor for positive floatation, hoping never to need it. Fuel 2 tanks and 2 batteries are installed under the cockpit. I had to modify the stock fuel tanks I ordered by catalog for they were 1/2 inch too large. If I had purchased them first I could have adjusted the frames to accommodate their size. I have twin 40 hp Mercury outboards. Top speed is about 25 knots which is fast enough for me. I modified the casting deck to make the cockpit larger in the bow. The new configuration makes the casting deck into seating. I also built an anchor well in the bow. I modified the storage area under the front seat of the control console by insulating it with Styrofoam and making it into a ice chest. A small drain was installed in the side. I found the plans very easy to follow and the materials list extremely valuable. 4-13-03: Email address valid. (see Customer Photos) KINGFISHER / Ian Wiedow / Montreal, Canada / / 10-16-02: I just bought most of my plywood today. I started cutting wood for the frames and I am begining to assemble them. Can hardly wait to build the building form and start seeing things come together. Things are a bit tight in here but I think I can make it. 4-10-03: Hi, sorry I didn't get the time to update my progress. As of today, April 10 2003: The frame members were assembled. I used epoxy glue with a mixture of silica and microspheres for most of my permanent contacts and stainless steel flat-head screws for fastening. Then I built the building form and started to place the frame members on the stringers. After that, I placed the battens, chine log and sheer clamp. I had a bit of trouble with the chine. What happened was, I had started fairing the chine just after frame #5 and in the blink of an eye, snap it broke, even with the boiling water on it, it broke. Oh well, better now than in the water. That was probably the worst thing that has happened, other than that, everything is going very well. I have all the plywood panels put on, I could not find any 10' B.C fir plywood so I had to use 8'. It just meant that there were 2 extra butt joints. After that I applied the 10 ounce fiberglass with apoxy. I found the video that I bought from you great to have. I watched it about 8 times and didn't make one mistake. When the fiberglassing and sanding was done I used a two part epoxy primer to cover the glass and then I used a white Interlux bottom coat for the bottom of the boat and ocean blue for the sides. It was 3 weeks ago today that myself and my brothers turned the boat over, it was quite a moment, I was very happy. The motor well is in, the deck is on, the cockpit sole is on, and now I am in the process of making the seats and the control console. Oh, and about a month ago I purchased a 150hp Johnson. It is a 1987, but I was told that she works great. KINGFISHER / Robert Baudrie / Dubai, United Arab Emirates / / 2-4-03: Building started 3 weeks ago, we are now almost ready to start with the fibreglass on the hull. Will keep you up to date. (See Customer Photos) KINGFISHER / Brad Blaicher / Vero Beach, FL / / 5-14-04: Started 5/4/04. Fastening the stringers to the jig tonight. KINGFISHER / Roman Repic / Ptuj, Slovenia / / 12-6-04: I and my two cousins are building a KINGFISHER. In the near future we will install keel, chine logs and bottom battens.
KING PIN / Chris Willemssen / Minneapolis, MN /
/ 8-12-99: Have purchased plywood, waiting for frame kit.
8-1-99: Frame kit arrived, all appears well. Am extending
20". Building form and motor stringers completed.
Transom and frames 1-5 are installed. Have scarfed 2 x
4's for keel. Will use a GM 502/502 for the motor. Plan
making hull/sides with 3/4" plywood to accomodate high
HP. 9-15-99: Have installed chine logs and sheer clamps; this
was a bit more straightforward than I thought it might be.
Starting fairing. 10-20-99: 1/2" marine plywood
installed on sides. This material was not too difficult to
bend. During installation I realized that one cannot have too
many C-clamps. Just beginning to fair plywood edges where the
bottom will lap. 11-14-99: Bottom battens in place; 3 of 6
bottom plank sections in place. 2-19-00: All planking
complete, outside fiberglassed. Used epoxy resin... easy to
layup, slow to sand. Strut, rudder, and fin installed. The
finishing began: 2 gelcoats followed by urethan prime coat.
Final gelcoat was done 2-19-00, boat was turned 2-26-00. Had
16 friends over for the "boat flipping"--really
only needed about 8, but the more the better. The sides,
foredeck and cabin area are now framed out. Next step is to
work on the cockpit area. Drivetrain progress: main strut,
fin, and rudder have been preliminarily bolted in. Motor (502
BBChev), Menkens V-drive, and transmission (GM T-400) have
been very preliminarily set in place, awaiting final
positioning dependent upon exact strut angle and location.
Currently the difficult part is planning the steering, gauge,
and control console. 07/31/00: The drivetrain is completed,
will start with a 13x16 3-blade Nibral prop. Topsides are
finish painted, colors are white/white with maroon
(wineberry!) accents. Upholstery is 1/2 installed. Steering
system (Teleflex dual cable NFB) is installed. Miscellaneous
rigging (cleats, hatches, bilge pumps, blowers) has been
completed. Wiring has just begun, with about 1 week needed to
complete the wiring. Definitely can see a launch date in the
very near future. 9-5-00: Beginning of Aug was spent
completing misc tasks: wiring, radio, gauges, etc. Then on
Aug 18, the motor was turned over and started for the first
time. After timing adjustments, the 502 Big Block Chev ran
well and cool. Then on Aug 24, the boat made its maiden
voyage to a local lake. I kept it "hovering" over
the trailer for about 2 hours while I ran the engine and made
some adjustments. No major leaks--only a couple of drips
coming through a couple of the main strut and cav plate
fasteners. The boat floated at a good level--not too high,
but not low enough to worry about waves running over the
stern sides. I then took the boat out for a short jaunt
around the lake at idle or just above. Everything seemed
good. The boat then made it back to "the shop" for
more misc. tasks. I hope to get it back in the water around
Sep 6 for more driving tests, possibly even some higher speed
runs. 11-16-00: The Kingpin has now had about 10 hours in the
water, and even 2 hours of skiing time. The boat runs well,
and moves around very nicely. Time to plane is extremely
short, likely helped a great deal due to large cav plates.
The wake is extremely ski friendly, but not quite as minimal
as a buddy's Malibu (but my boat is 4' longer than
his!). The boat turns fairly well, with one small quirk I
have yet to work out: At medium speeds and above, as you
gradually increase the turn sharpness (rudder angle), there
comes a point where the nose of the boat drops, and the boat
kind of "falls out" of the turn. I'm pretty
sure this is due to the rudder angle becoming too sharp and
then not allowing the prop driven water to flow past the
rudder correctly. I think this will be solved by adjusting
the rudder tiller arm stops to an "earlier"
position. I plan to do this and test it as soon as the ICE
goes away here in Minnesota. Due to motor newness, I have not
run an all-out top speed test. I have run the boat to about
55 mph, with the tach reading 3700 rpm. There is definitely
some more engine to use once it gets broken in a bit
more. KLONDIKE / Curtis Gard / / Colfax, IA / 9-28-03: Well it's officially started. Finished the first frame, started on the next. Did frame #7 first because of no angles required on the outside bottom or sides. Still, there were angles to work with, in fact more angles than I had cut in the last year making cabinets and furniture. I weighed frame #7 and it tipped the scale at 145 lbs and there are 14 frames total.
KLONDIKE / Bill DiFilippo / New Jersey /
10-2-05: I started building the Klondike in October, 2004.
All frames, plus sheer, chine, side and bottom battens in
place. I am now installing the bottom planking. KONA KAI / Charles Newbold / / 5-28-99: Getting ready to launch Kona Kai. Took about 2.5 years to build. Will be launched in Aransas Bay, Rockport, TX. Powered by Mercruiser LH 205 hp V6. 3-5-02: I would like to pass on this update on the kona kai that I built 3 years ago. I found the fly bridge to be cramped and made this modification. The boat is now docked in Rockport, TX LA PAZ 22 / Brian Landau / / 3-20-08: Hi, I have started construction on the LA PAZ-22. I am at the setting of the keel into the frames.LAZY DAZE / Randy Payne / / 04-03-01: Just recieved the plans for the Lazy Daze, will spend the next couple of days reading and buying supplies. After a lot of reseach I am glad to begin building, I was getting tired of looking for a project boat. L CAPITAN MODEL / Dave Swall / / 5-17-00: I have just completed a model of L Capitan. Started the last week of Oct 99 and completed it May 1, 00. Pictures will be in the next news letter (WebLetter 19). I would like to hear from other model builders. (L Capitan: 17'-3" Inboard runabout with "fins", designed 1957, no longer in Glen-L catalog) L DORADO / David White / Canada / email address not valid 4-8-03 / 9-14-99: Built an L Dorado in 1958? and a second one last winter. I have info on dashbeam, carling, and tail fin as these full size patterns are no longer available. (See Customer Photos) LITTLE HUNK / Arlon Motsch / / finished 1-6-95 and in use. Nice little boat. I'm using a 70 hp nissan, bracket mounted off the transom rather than mounting inside the hull. Used from flats to open gulf. Runs rough water 4'-6' in the passes when others are sittin and wishin. Center console, front and rear casting platforms, extra wide gunnels, large bimini (may replace with a market umbrella as it takes up useable space). Only regret is I wish I had gone for the hunky dory in aluminum. Maybe my next project? LITTLE HUNK / Patrick Shannon / Vancouver Island, Canada / / 4-28-04: Have just started. Building form finished. Cutting and positioning frames at present. 9-11-04: Didn't do much over the summer. Boat is framed, beveled, faired, and ready to plank. No major problems up to this point. Soaked and steamed the chine - went on easily. Split the sheer and laminated the layers - worked, but prefer steaming - less steps for me to screw-up! Laminated an extra layer to the inside of the sheer between frame #9 and stem. The sheer was becoming a bit to triangular for my liking. Hope other builders are having fun. Take care. 12-22-04: The planking has been completed as has the glassing. At present, the boat is being sanded. The planking went well. Extra time was spent on beveling the frames so the planks would sit against the frames in the bow area. Afterwards I re-read the instructions and discovered this was not necessary - typical Tim Allen move! The plank joints were scarfed. It was a bit tricky trying to attach the bow and mid section to the frame by myself. It would have been easier to butt joint or scarf in place or buy beer and enlist some friends help. The bottem was glassed with some carbon cloth left over from another project. Since the exterior bottom battens are going to be left off, I figured the carbon would add some strength across the bottom and at the joints. Hope to get the boat turned soon so I can get at the interior since it will probably be more time consuming. 8-29-05: It has been awhile since I updated my project, so here goes. Decided not to leave off the bottom battens since most of the beaches will be cobble. Put the antifouling on before turning the boat. Turning the boat was very easy. Built a square platform and attached wheels. Placed a line of old tires where the sheer would hit the floor, unscrewed the boat from the hardback, eased boat on to the tires, and flipped it onto the platform. My wife and I turned it by ourselves before a dinner party where the predinner entertainment was to have been boat turning. So the quests got to drink the beer and wine with no heavy lifting. Built a small cuddy cabin in the bow to act as an anchor locker and for storage. Added deck beams and decked the cuddy, side decks, and transom. Wanted the side decks so there would be a straighter surface to balance against when fishing. Built the interior motor well. Followed the plan directions with the exception of the carriage bolts running through the motor board and shaped blocking. I felt the carriage bolts were a little to large in diameter for the thickness of the shaped blocking. Used thinner lag bolts instead. Have just finished fiberglassing and sanding the decks. Presently working on the sheer rub rails and coamings. The interior, at present, consists of a bench seat in front of the cuddy and seats on either side of the motor well. The latter will provide access to the bilge pumps and storage. Not sure about the rest of the interior. It will, however, consist of a center helm and some more seating to accomodate fuel and batteries. Had planned to have it in the water this Sept., but next spring is more likely, since I still have to outfit, buy a motor and trailer, etc. In any case, the project has gone well so far. In fact, as I get closer I find myself checking the Glen-l catalogue for a next project. Hope everyone is having fun. LITTLE HUNK / Chris Nichols / Sydney, NSW, /Australia / / 5-5-04: Frame complete will now coat entire frame with a couple of coats of epoxy before I start planking. Very enjoyable. LITTLE HUNK / Charles Henthorn / Ogden, Utah / / 7-22-04: I received plans for the LITTLE HUNK about a week ago and have spent many hours on the Internet digging up information about how a first-time home boat builder should proceed? I also talked with Patrick Shannon (see registry) about his project, and he passed along some very helpful tips. I contacted Barry with Glen-L customer service, and he got me started down the right path on my dimensional concerns. I'm building this boat for my two youngest sons. They will be fishing big inland lakes and off the Pacific northwest coast. Therefore, I've decided not to deviate from the Glen-L plans and building instructions, and NOT build it on the CHEAP as originally planned. Material and tools should start arriving next week. LITTLE HUNK / Donald Thornton / Fayetteville, TN / / 3-1-05: I started construction in April of 2004. The construction went very well due to the full size patterns. The only real problem I had was bending the sheer clamps. I broke them three times. I ended up splitting them about eight feet on the band saw and then gluing them back in place, worked the first time after that. My friends are coming over to flip the boat on March 2, 2005 and hope to be fishing in the boat by May at least. I will send pictures when completed. What's best about boat building is the look on people's faces when you tell them you are building a boat. It is very addictive, I will start another one as soon as I am done with this one... Double Eagle is looking good. LITTLE HUNK / Jim Wallace / / 11-5-05: Got the plans approximately 1st of Sept or so this year, and have all the frames, breasthook, stem and transom built. Will start assembling shortly. I think this is going to be a fun project. LITTLE HUNK / Rod Johnson / Mercer Island, Washington / / 7-3-09: I have completed building 10 frames, I have put one coat of epoxy on them. I am now beginning to cut out the transom. LITTLE HUNK / Bill Stackpole / Portland, Connecticut / / 1-25-10: Finished the ribs but I have a few questions concerning them and the layout of the transom.
LO VOLTAGE / Patrick Morais / Ottawa, Ontario,
Canada /
/ 12-22-10: I am a Cabinetmaker for the House of Commons at
Parliament Hill in Canada`s capital city of Ottawa. My real
goal is to build the Biscayne but I have to please the wife
first and decided to start with the Lo Voltage for our new
lake cottage property. Great for sunset martini cruises. I
received the plans for the Lo Voltage on Dec 13th, did hours
and hours of research and studied the plans. Bought my first
sheets of 1/4" marine grade mahogany plywood and of the
6, I have already cut 4 sheets into parts..total about 3 hrs
building time. LORD NELSON / Geronimo Garvie / / 9-9-98: Building in Argentina -setting up the longitudinal battens. 11-9-98: Starting planking. 3-6-03: Hull is finished. Decking at the moment. LORD NELSON / Clark McGill / Canton, Ohio / / 10-12-06: Received plans 10/11/06 and started building form. LUCKY PIERRE / Chuck Stinchfield / / Started 20 June 99, couple hours a day. Have frames set up and putting on chines. Can watch progress on my site www.onthegulf.com LUCKY PIERRE / Pierre Levesque / Quebec City, Canada / / Boat finished in 1992. Many modifications have been done since. Now making a sailboat from this motor boat. LUCKY PIERRE / Morton L. Caplan / Big Tancook Island, Nova Scotia / / 9-4-03: Completed several years ago exactly to plans with cockpit well for 15 HP Honda four-stroke outboard. Building required 1,200 hours and was a first time boat building project for moderately experienced wood worker. Cruises at 6.5 knots. Very tender but probably less so with a ton of fish. built in Southern Arizona, now on Big Tancook Island, Nova Scotia. M thru ZHome Page |